Commercial · Hotel & Resort · Completed 2021

Four Seasons Alexandria

Wood and granite works at Four Seasons Alexandria for the developer TMG. EDGE supplied and executed the wood trellis works for the villas and the granite works for the pool deck.

Location
Alexandria
Role
Sub-Contractor
Client
Talaat Mostafa Group (TMG)
Materials
Wood, Granite
See all 4 photos
Granite pool deck being laid beside a villa pool, with a worker on site
Wooden trellis over a villa terrace, above a stone-clad wall
Underside of a wooden trellis above a villa terrace
Curved granite pool deck edge with fresh paving, during construction
Client
Talaat Mostafa Group (TMG)
Designer
PYR (Pierre Yves Rochon)
Main contractor
Atrium Quality Contractors

Scope of work

  • Wood trellis works for 21 villas
  • Pool deck granite works

Highlights

  • Fast Track Project
  • Wood Trellis: Start to Completion 3 Weeks
  • Wooden trellis over a villa terrace, above a stone-clad wall
  • Underside of a wooden trellis above a villa terrace
  • Curved granite pool deck edge with fresh paving, during construction